top of page

Peter Kitaeff

Senior Project Manager

B.E. Honours (Civil), NZGBC

021 977981

Peter Kitaeff

Peter is an accomplished Project Manager with a Civil Engineering background and has accumulated over eight years of experience on multiple large infrastructure, vertical build, construction and design projects.


He has gained valuable experience in contract administration, design management and project management. Peter works to develop close relationships with the client and stakeholders to understand their requirements to deliver the best possible results. He has multi-sector experience which he acquired working across various fronts with contractor, design and consultancy/ client project management companies.


Having managed projects from inception through to delivery, Peter has an edge in successfully delivering projects and exceeding client expectations. He is adept at managing designers to meet programmes and deliver solutions that fit within project budget constraints whilst still satisfying the overarching requirements for the stakeholders. He is well versed in taking complex information and processes and communicating them simply and effectively to a wide range of stakeholders. Peter has shown the ability to adapt quickly to challenging situations, deliver effective solutions and think on his feet.


Peter’s career began as a Site Engineer in Fletcher Construction, which afforded him the opportunity to work across the FCC business unit and a clear perspective of the contractor’s role in delivery. As a result, he has developed a keen eye for detail and solid foundation of practical experience in construction and engineering. He has solid experience working in live and critical environments.


Peter’s strength lies in his project management experience across the project lifecycle, from planning, consultant tendering and managing the design phase, through procurement and contract negotiation, stakeholder management and relations, to managing project documentation, and health and safety and construction.


Peter's project experience


Commercial/Retail
  • Foodstuffs Wairau Pak'nSave ($15m)

  • Foodstuffs Warkworth Pak’nSave ($58m)

  • Foodstuffs New World Green Bay - Major Refurbishment ($8m)

  • Foodstuffs New World New Plymouth - Roof Replacement

  • Vikki Lane - Office Fitout – Augusta

Healthcare
  • North District Health Board: Whangarei Hospital – Business Case

  • SSBC1: Theatre Capacity Project, Endoscopy Suite Project, Cardiac Catheter Laboratory

  • SSBC2: Maternity Expansion and Link Building, and the Temporary Acute Assessment Unit


Residential
  • AKA Residential Walker Road Terraced Housing Development

  • Omana Residential Development ($8m+)


Infrastructure/ Transport
  • North Auckland Rail Line Upgrade ($1.3b)

  • AMETI - Phase 1 ($99m)

  • State Highway 1, Rangiriri Bypass ($80m)

  • Transmission Gully ($850m+)

  • Golden Bay Cement Plant - GBC Portland

  • Mackays to Peka - M2PP) ($630m)

  • Curra to Maryborough Highway - Planning Study – Brisbane

  • Frankton to Queenstown Single Stage Business Case & Queenstown Town Centre Detail Business Case

  • Ferry Future Strategy Services - Strategy Advisor

  • Medallion Drive Link Tender


Energy
  • Vector - Rotu Drive Substation

  • Vector - Wiri Zone Substation

Ministry of Education
  • Kowhai Intermediate School - New Teaching Block ($6.5m)

  • Oranga Primary School ($4m)

  • Grey Lynn School |($15m)

  • Swanson School - Block 2 ILE Upgrade

  • Hauraki School - Stage 1 - ECI ($8m)

  • Long Bay Primary School ($4m)

Unique
  • Auckland International Airport Expansion – AIAL Phase 3 ($180m)

  • Westgate Multipurpose Facility ($26.9m)

bottom of page